Deep excavation and legacy ground conditions
Once drawdown exceeds what a wellpoint system can achieve, deep wells or a staged multi-level design are required, and that call has to be made before mobilization. Burnaby also carries a legacy of industrial use along Still Creek and the older Willingdon and Douglas corridors, where groundwater can contain hydrocarbons or dissolved metals. Those sites need treatment before discharge and monitoring records that hold up at review.
Why the cheapest quote is rarely the lowest cost
A lower dewatering quote usually means something was left out. A method that cannot reach the drawdown a parkade excavation requires. No treatment step for water that was always going to need one. No allowance for the sampling a Still Creek discharge demands. Those omissions do not appear as line items. They appear as an excavation that cannot be worked, a second mobilization, or a discharge shut down mid-pour with every trade waiting. On a tower schedule, that is a bad trade. We scope the full chain up front and tell you where the risk sits before you sign.







.avif)
.avif)
.avif)

