IINDUSTRIES
/
Wastewater Treatment Plants

Dewatering for Wastewater Treatment Plant Projects

NexGen Environmental supports wastewater treatment plants throughout British Columbia with temporary bypass pumping, dewatering systems, vacuum truck services, sludge handling, and mobile water treatment solutions. We help municipalities and industrial facilities maintain operations during maintenance, upgrades, emergency repairs, and capacity expansion projects.

Dewatering Support for Wastewater Treatment Plants at Every Stage

Wastewater treatment plant sites often face ongoing water management challenges that require careful planning and consistent control. Nexgen works alongside plant teams to provide dewatering support that helps maintain progress, meet regulatory requirements, and protect reliable facility operation.

cutout-background
icon-quarter-circle
SOLUTIONS

What Services We Provide For Wastewater Treatment Plants

Tailored Dewatering Project built for Residential Developers

Bypass Systems
Bypass Systems
Redirect flow when lines must stay live. Temporary bypass systems for staged tie ins, maintenance windows, and work zones that cannot take downtime.
arrow rightarrow right
Explore Bypass Systems
Sediment Removal Systems
Sediment Removal Systems
Removes heavy solids earlier so downstream steps stay steadier. Helpful when runoff changes after rain or disturbance.
arrow rightarrow right
View Sediment Removal
Wellpoint Systems
Wellpoint Systems
Lower groundwater around shallow excavations using a wellpoint system when soil conditions support a drawdown. Layout, install, and startup built for production work.
arrow rightarrow right
View Wellpoint Systems
icon-quarter-circle
Solutions

Dewatering Experience Supporting Wastewater Treatment Plants

Hands on dewatering support for wastewater treatment plant sites focused on maintaining stable conditions and consistent performance.

card-portrait
“When our water pump for the tower went down and we had a fresh load of concrete needing water/cooling in the heat of the Summer right before a long weekend, Nexgen saved the day.”
Charles DeWeerdt
Vancouver, BC
8
1
8
0
8
1
+
Projects completed
8
1
8
0
8
1
B+
Litres of water managed
8
1
8
0
8
1
Years operating
icon-quarter-circle
CUSTOMER REVIEWS
"I’m a project manager for large commercial construction projects and have had great success with Nextgen. The service and equipment are all top notch and the pricing competitive!"
“Manoj Nair and Chris Palm were very helpful in helping our team get a water treatment system set up in short order. They were responsive, professional, and knew what we needed to get the job done. I will surely be working with them again!”
“Herman and his team have helped me with a couple services. They have been absolutely standup people to work with and would happily recommend them.”
icon-quarter-circle
projects

What We Deliver for Wastewater Treatment Plants Through Dewatering

Reliable, hands on dewatering support focused on safe water control, efficient site conditions, and consistent wastewater treatment plant operation.

Burke Mountain Secondary School Groundwater Treatment
arrow up right

NexGen Environmental designed and operated a contaminated groundwater treatment system for the Burke Mountain Secondary School construction project in Coquitlam, British Columbia. During excavation and foundation construction, the team managed PFAS impacted groundwater using a customized treatment process that ensured water discharged from the site met environmental compliance requirements. By combining dewatering expertise with advanced water treatment systems, NexGen helped keep construction activities on schedule while protecting surrounding infrastructure and the local environment.

arrow rightarrow right
Learn more
North Shore Waste Water Treatment Plant
arrow up right

NexGen Environmental provided dewatering and construction water treatment services for the North Shore Wastewater Treatment Plant upgrade project in Metro Vancouver. The project involved managing groundwater and process water generated during construction while meeting strict municipal discharge requirements. Through customized treatment systems and ongoing operational support, NexGen helped maintain environmental compliance throughout the project while minimizing disruptions to construction activities.

arrow rightarrow right
Learn more
Westshore Terminals
arrow up right

NexGen Environmental partnered with Bel Contracting to provide vacuum truck services and dewatering support for construction activities at Westshore Terminals in the Lower Mainland of British Columbia. Operating within a busy marine and industrial environment required dependable site water management and rapid response capabilities. NexGen's specialized equipment and experienced crews supported efficient construction operations while helping maintain environmental compliance throughout the project.

arrow rightarrow right
Learn more

Ready to Move Your Wastewater Treatment Plant Project Forward with Dewatering Support

Connect with Nexgen to discuss dewatering support tailored to the specific conditions of your wastewater treatment plant site.

cutout-background